21
Apr 01
Foundation
is poured.
|
25 Apr 01
Foundation is filled in. |
30 Apr 01 Concrete
form is cured; wall removal and slab is next.
|
02
May 01 View of inside wall before construction.
|
02 May 01 Temp wall
is raised. Outside wall will now come down.
|
|

|

|

|

|

|
|
03
May 01 The (Annex area) exterior wall is being removed.
|
04
May 01 The slab has been poured and is being smoothed out.
|
07
May 01 The TCPT (section #1) is moved from Hangar #9 to the Museum.
|
07
May 01 The TCPT is being unloaded.
|
07
May 01 View from the other side; two forklifts were needed.
|
|

|

|

|

|

|
| 08
May 01 Section #2 is transported and unloaded. |
09
May 01 Both sections are on the slab, awaiting to be mated together. |
18
May 01 709 is now one unit again...the steel frame for the Annex is
assembled. |
19
May 01 The walls are being built. |
19
May 01 End view showing the size of
the Annex in relation to the TCPT. |
|

|

|

|

|

|
|
25
May 01 Waiting for doors and windows to be added. |
Nov 02 Outside View
of Completed Trainer. |
Aug 02 Flight
Engineer's panel. |
Aug
02
Routine Nav Position.
|
Nov
02 Tactical Compartment looking forward. |
|

|

|

|

|

|
| Aug
02 Julie/Mad Position. |
Nov
02 Tacco and Pilot. |
Nov
02 Tactical Compartment looking aft. |
Nov
02 ECM Station. |
Nov
02 Radar Station. |